Grid for Namas Wind Farm

GRID CONNECTION INFRASTRUCTURE FOR THE NAMAS WIND FARM NEAR KLEINSEE, NORTHERN CAPE PROVINCE

Project Name: Grid Connection Infrastructure for the Namas Wind Farm, Northern Cape Province

Applicant: Genesis Namas Wind (Pty) Ltd

Proposed Activity: The development of a grid connection solution associated with the Namas Wind Farm. The grid connection infrastructure associated with the grid connection solution will include the construction of a collector substation (Rooivlei Substation), a double-circuit 132kV power line and associated infrastructure including access tracks/roads and laydown areas.

Location: A 300m wide and 32km long grid connection corridor, located between the authorised Namas Wind Farm and the Gromis Substation, is being assessed. The corridor is located near Kleinsee and within the Nama Khoi Local Municipality and the Namakwa District Municipality. The grid connection corridor is located within the northern corridor of the Strategic Transmission Corridors and the Springbok Renewable Energy Development Zone (REDZ), gazetted on 16 February 2018 (GNR113 and GNR114). The grid connection corridor traverses the following properties:

» Portion 3 of the Farm Zonnekwa 328 » Remaining extent of the Farm Sand Kop 322
» Portion 2 of the Farm Zonnekwa 328 » Remaining extent of the Farm Mannels Vley 321
» Portion 1 of the Farm Zonnekwa 326 » Remaining extent of the Farm Dikgat 195
» Remaining extent of the Farm Zonnekwa 326 » Portion 15 of the Farm Dikgat 195
» Remaining extent of the Farm Honde Vlei 325 » Remaining Extent of Farm Rooivlei 327
» Remaining extent of the Farm Kannabieduin 324

Basic Assessment Process: The project is subject to the requirements of the Environmental Impact Assessment (EIA) Regulations of 2014 published in terms of Section 24(5) of NEMA. Various aspects of the project are listed as activities in terms of the EIA Regulations, 2014 (as amended), that may have a detrimental impact on the environment. Savannah Environmental is undertaking the required environmental assessment and public participation process.

The process will also include the submission of Water Use License Applications to the Department of Water and Sanitation (DWS) as regulated by the National Water Act (Act No. 36 of 1998).

Basic Assessment Report Available for Review and Comment: The Basic Assessment Report is available for review and comment from Wednesday, 29 May 2019 to Monday, 01 July 2019 and can be viewed at the Kleinsee Public Library, 3rd Avenue, Kleinsee or downloaded from  our website (see below). The due date for written comment is Monday, 01 July 2019.

To obtain further information and register on the project database, please submit your name, contact information and interest in the project to:

Nicolene Venter at Savannah Environmental
P.O. Box 148, Sunninghill, 2157
Tel: 011 656 3237
Fax: 086 684 0547
Email: publicprocess@savannahsa.com
Website: www.savannahsa.com

Documents for public review are available for download.

Please click publicprocess@savannahsa.com to access the document.

Contact Savannah Environmental

If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256

Menu