Hyperion 132kV Grid Connection Infrastructure

Establishment of 132kV Grid Connection Infrastructure for the Hyperion Thermal Hybrid Facility Near Kathu, Northern Cape Province

Applicant: Hyperion Solar Development (Pty) Ltd

Proposed Activity: The development of a 132kV overhead power line to connect the authorised Hyperion PV Solar Energy Facility complex and proposed Hybrid Thermal Power Facility to the national grid via the Kalbas substation. The proposed grid connection infrastructure is 7.75km long and includes an assessment corridor of 300m wide.

Location: The proposed 132kV overhead power line will be located approximately 22km north of Kathu within the Gamagara Local Municipality which falls within jurisdiction of the John Taolo Gaetsewe District Municipality, Northern Cape Province and will cross Remainder of the Farm Kathu 465 and Portion 1 of the Farm Selsden 464.

Basic Assessment Process: In terms of Sections 24 and 24D of the National Environmental Management Act (No 107 of 1998), as read with Government Notice R324 – R327, as amended, a Basic Assessment (BA) is required for the Environmental Authorisation of this project. Savannah Environmental is undertaking the required BA and public participation process for the project.

BA Report Available for Review: A BA Report is available for review and comment. The report can be viewed at https://www.savannahsa.com/public-documents/grid-infrastructure/hyperion-132kv-grid-connection-infrastructure/ from 21 October 2020 – 21 November 2020. The due date for written comment is 21 November 2020.

Public Participation Process: Savannah Environmental (Pty) Ltd has been appointed as the independent environmental consultant responsible for undertaking the BA and Public Participation processes in support of these applications for EA. To obtain further information on the projects and to register on the project database, please submit your name, contact information and interest in the project as per the details below.

Consultation Meetings: Consultation meetings will be held with relevant I&APs and stakeholders via an appropriate forum during the review period. Should you wish to be included in these meetings or receive further information on the project please contact us as per the details below

Nicolene Venter at Savannah Environmental

P.O. Box 148, Sunninghill, 2157

Tel: 011 656 3237 /  Fax: 086 684 0547

Email: nicolene@savannahsa.com

Website: www.savannahsa.com

October 2020

Documents for public review are available for download.

Contact Savannah Environmental

If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256