Spinning Head WF S54 Audit Report

NOTICE OF AN EXTERNAL COMPLIANCE AUDIT

(SECTION 54) AND PUBLIC PARTICIPATION PROCESS:

SPINNING HEAD WIND FARM DEVELOPMENT, MOLTENO, EASTERN CAPE PROVINCE

Notification of Submission of Section 54(A)(3) Audit Reports to the Competent Authority

As a registered Interested and Affected Party for the Spinning Head Wind Energy Facility, please be advised that in terms of Section 54(a)(3) of the EIA regulations (GNR 326, 7 April 2018), Savannah Environmental (Pty) Ltd has undertaken an external environmental compliance audit and prepared an external environmental compliance audit report assessing Rainmaker Energy Projects (Pty) Ltd’s compliance with the EMPr applicable to the project.

Rainmaker Energy Projects (Pty) Ltd received authorisation for the Spinning Head Wind Energy Facility (WEF) on the 2nd November 2012 (DEA ref: 12/12/20/1778/4), following an application for splitting of the Dorper Wind Farm EA (DEA ref: 12/12/20/1778).  The Spinning Head WEF was subsequently amended for turbine dimensions amongst others, detailed below:

  • 12/12/20/1778/4 (2012): Original EA issued for Spinning Head Wind Energy Facility (after splitting the Dorper WEF EA);
  • 12/12/20/1778/4 (2013): Turbine specifications changes (hub height and rotor diameter);
  • 12/12/20/1778/4/AM3 (2016): Validity extension of the EA; and
  • 12/12/20/1778/4/AM4 (2018): Validity extension of the EA.

The Spinning Head Wind Energy Facility includes a maximum of 5 wind turbine units with concrete foundations, underground electrical distribution cabling between the turbines, a shared substation (between the various phases of the Dorper WEF), internal access roads of ~5km long and 6m wide, a small office and workshop, laydown areas of approximately 0.5ha and an overall generation capacity of 12.5MW, comprising a development area of approximately 341.4ha. Spinning Head WEF comprises the following properties:

  • Portion 4 of Farm 68; and
  • Farm 96.

In terms of Section 54(A)(3) of the EIA Regulations 2014 of GNR 326, an independent external compliance audit (“S54 Audit”) is required to verify compliance towards the Environmental Management Programme (EMPr) for the project.  This notification hereby notifies all potential and registered interested and affected parties, including organs of state with applicable jurisdiction as well as the competent authority, of the submission of the external compliance audit reports to the competent authority.  These reports are available at https://www.savannahsa.com/public-documents/other/ for 14 days from date of this notification.

Please direct any queries, information requests or comments to the DEA compliance directorate, at the following:

Kind regards

Nicolene Venter

Public Participation and Social Consultant

Email:  publicprocess@savannahsa.com

Documents for public review are available for download.

Please click publicprocess@savannahsa.com to access the document.

Contact Savannah Environmental

If you would like further details, please do not hesitate to contact any member of
our Environmental team at +27 (0)11 656 3237 / +27 (0)11 656 3256

Menu